The workload view allows tracking the distribution of workload over different time periods. It provides various display and filter options to gain a detailed overview of resource utilization.
Accessing the Workload View
- The utilization view can be accessed via the main menu in the left sidebar under
Workload
. - Or select the "Workload" tab in your project.
Overview of the Utilization View
The utilization view consists of multiple sections:
- My Utilization: Displays only your personal workload.
- Team Utilization: Shows the workload of your team, provided you are designated as a team lead.
- Overall Utilization: With the "HR" permission, all resources in the workspace can be viewed here.
The utilization view within a project: Displays only the logged times for that specific project.
Summary row in the workload view
In the workload view, you can display a summary row as needed, showing the total hours of all selected resources per day or week. This provides a quick overview of the overall effort and potential bottlenecks.
How to display the summary row
- Switch to the workload view.
- Click on Options (top right).
- Enable the Show summary row option.
After enabling the summary row, the total value (e.g., total hours) for the respective day or period is displayed. This allows you to see at a glance whether resource utilization across all people is still within acceptable limits or if certain days are critical.
Filtering and Displaying Resources
The utilization view offers various filtering options to adjust the display:
- Filters: Resources can be filtered by team members or task attributes.
- Time Period: Adjust the date range to display weeks or months.
- Resource Selection: Toggle between viewing teams or all resources.
Simulation Mode
In simulation mode, task modifications can be made and their impact on workload assessed without affecting actual data. Changes can be saved or discarded.
Saving Views
In the utilization view, customized views can be saved and shared with others.
- Filters: Saves selected filter settings.
- Time Period: Defines a fixed date range for the view.
- Display Options: Allows switching between weekly and daily aggregation.
- Resource Selection: Saves the selection between teams or all resources.
Additional Options
Under "Options," further display settings can be configured, such as enabling a weekly summary or forecast values.
Analytics panel
In addition to the existing options, you can display an analysis panel via Options. This panel provides further evaluations and metrics related to the workload data. For example, you can see aggregated values, percentage workloads, or other statistical information about the displayed resources and times here.
- Select Options in the workload view at the top right.
- Click Show analysis panel.
Depending on its configuration, the analysis panel can display various metrics, such as the total number of planned hours, average values, or percentage workloads within the examined time period. As a result, you gain an even more detailed overview of possible bottlenecks or overloads.
Notes
- The utilization view only displays resources with relevant data within the selected time period.
- Permissions determine which sections (My Utilization, Team Utilization, Overall Utilization) are visible. Users without HR permission cannot access overall utilization.
- Changes to tasks or time entries directly impact utilization. If data does not appear as expected, check the assigned tasks and logged times.
Comments
0 comments
Please sign in to leave a comment.