π― Objective of this section
The Cost Tracking module forms the basis for the financial management of construction projects.
Here, all costs are structured, planned, and continuously updated according to DIN 276 or optionally according to the Standardleistungsbuch (STLB).
The module enables transparent tracking of the development from the initial cost estimate, through the cost calculation, to cost tracking (LPH 6).
Basic structure
Cost tracking is organized hierarchically according to the DIN 276 cost groups.
By default, the 100-level structure (first level) is included in the template.
- Level β Example β Description
- 100 level β 300 Building construction β Main cost groups
- 10 level β 310 Excavation pit β More detail by sub-areas
- 1 level β 312 Soil improvement β Finer subdivision of individual services
π‘ Note:
The 100-level cost groups are predefined in the template and form the starting point for cost planning.
If needed, the structure can be expanded to the 10 and 1 levels to enable more detailed cost tracking.
Level structure and how to work with it
New cost groups can be created directly in the list:
- Via
+β create a new record on the same level - Via
Subtaskβ create one level deeper - In the
Cost group selectioncolumn, select the desired cost group (according to DIN 276) - By clicking
β‘οΈ Apply title, the official name from the cost group is copied into the title column
π‘ Titles can also be overwritten individually, e.g. for special measures or internal naming.
Service phase columns
Each service phase (LPH) is managed as its own column in cost tracking.
Values are updated per phase.
- Column β Meaning
- LPH 1 β Cost framework β first rough calculation
- LPH 2 β Cost estimate β more precise allocation to 100-level groups
- LPH 3 β Cost calculation β detailed calculation (10/1 level)
- LPH 6 β Cost tracking β ongoing updates during execution
π‘ Unlike earlier versions, no new folders are created per LPHβ
instead, values are updated via the columns LPH 1, 2, 3, 6.
Transferring values between service phases
Instead of copying new phases, values can be transferred via the column header.
Hereβs how:
- 1οΈβ£ In the column of the source phase (e.g., LPH 3 β Cost calculation), right-click the column header
- 2οΈβ£ Select the menu
Copy values to - 3οΈβ£ Select the target column (e.g., LPH 6 β Cost tracking)
- 4οΈβ£ smenso automatically transfers all values from the lowest level into the new column
- 5οΈβ£ Totals on higher levels are calculated automatically
β οΈ Important:
- Inputs are allowed only at the lowest level (e.g., a 1-level cost group)
- Higher-level totals are created automatically through aggregation
π‘ Tip:
This function is ideal for efficiently carrying cost updates from one service phase into the next.
Set the current phase
By right-clicking the relevant phase column, you can mark the current service phase via Mark column. The marked column is highlighted in green.
Selecting the current LPH affects which values are displayed in the portfolio.
Example of a cost hierarchy
- Cost group β LPH 1 (Framework) β LPH 3 (Calculation) β LPH 6 (Tracking)
- 300 Building construction β β¬600,000 β β¬630,000 β β¬628,000
- 310 Excavation pit β β¬80,000 β β¬83,000 β β¬83,000
- 312 Soil improvement β β¬15,000 β β¬18,000 β β¬18,500
- 320 Structural shell β β¬250,000 β β¬255,000 β β¬257,000
π‘ Values on lower levels automatically overwrite the totals above.
Link to contract and cost forecasting
- The values from the most recent LPH column (e.g., LPH 6) are automatically transferred to the forecast.
- As soon as a contract is created and linked to a cost group (100 level), the contract amount is deducted from the planned line item.
- The difference appears as the βamount still to be allocatedβ in the forecast view.
π‘ The interaction between cost planning and forecasting enables dynamic allocation of funds on a quarterly basis.
Combination with STLB
Alternatively or additionally, items from the Standardleistungsbuch (STLB) can be used.
This level of detail is helpful for comparing services or for specific tenders.
Example:
Cost group 330 β External walls
- STLB item: 330.112 Facing brickwork, double-leaf, 240 mm
- Unit price: β¬145/mΒ²
- Quantity: 220 mΒ² β Cost: β¬31,900
Filters, views, and evaluations
Filters
- By cost group, service phase, or budget status
- e.g.: βShow all cost groups with a budget overrun > 10%β
Views
- Custom layouts can be saved (e.g., βCost calculation LPH 3β, βCost tracking LPH 6β)
Totals and formulas
- smenso calculates all totals automatically
- Percentage deviations or remaining budgets can be supplemented via formula flavors
Best practices
- Plan roughly in LPH 1, add detail from LPH 3 onward
- Use hierarchies (100 / 10 / 1) for clarity
- Use βCopy values toβ instead of manual recalculation
- Name cost groups consistently (according to DIN 276)
- Check the current LPH column before creating forecasts or reports
π Related topics
- Chapter 6 β Dates & schedule
- Chapter 8 β Contracts
- Chapter 9 β Forecast & cash flow planning
- Chapter 13 β Status reports
π‘ Practical note:
Cost tracking is the foundation of all financial evaluations in smenso.
Only through consistent maintenance and correct assignment of cost groups can budget, forecast, and cash outflow be presented accurately.